Client: Ravensdown Fertiliser Limited Project: Limeworks Building, Balfour
After a fire that totally destroyed our client’s lime drying facility, we were immediately commissioned to design a replacement building. Time was of the essence as the facility had to be operating as soon as possible to keep up with supply and demand.
DesignBASE were onsite within two days of the fire undertaking site measurements. To reduce the fabrication time, we decided to detail the structure to a shop fabrication stage. The project went well with a compressed time frame from design commencement to the plant being operational again. |